Skip to content
NewcastleConcreters
  1. Home
  2. Guides
  3. Section 138 driveway approval

Section 138 driveway approval in Newcastle and Lake Macquarie

The approval that sits between your kerb and your boundary, explained without the portal jargon. What it is, when it applies, how City of Newcastle and Lake Macquarie City Council each take the application, and what their inspectors expect to see before concrete goes in.

Checked against council sources, September 2026

What Section 138 actually is

Your driveway is two pieces of concrete with a legal line between them. From the garage to the front boundary it sits on your land. From the boundary to the kerb it sits on the road reserve, which is public land in council’s care even though you paid for the concrete and you look after it.

Section 138 of the Roads Act 1993 says nobody other than a public authority can carry out work on, over or under a public road without the consent of the roads authority, and “road” takes in the footpath, the nature strip and the kerb. For nearly every residential street in Newcastle and Lake Macquarie the roads authority is the council. On a classified road, Transport for NSW can need to agree as well.

So “Section 138 approval” is simply council’s written permission to build, change or remove the crossing: the layback in the kerb and the slab across the verge. It is not a development application, it is not part of a complying development certificate, and having either of those does not give you it.

When you need it, and when you do not

You need it when the work touches the road reserve:

  • a first driveway on a new lot
  • widening an existing crossing, or adding a second one
  • replacing a cracked or sunken crossing, even like for like
  • moving a driveway, which also means removing the old layback and reinstating kerb and grass
  • connecting a stormwater pipe through the verge to the kerb, which is a road opening permit on the same application

You generally do not need it for concrete that stays inside your boundary: the driveway from the boundary to the garage, a path down the side, a patio or a shed slab. That work answers to the NSW exempt development rules instead, which set their own limits. Most driveway jobs include both pieces, which is why the approval is worth sorting before anyone books a truck.

The NSW Planning Portal, and why you may not use it

Search for Section 138 and most results send you to the NSW Planning Portal. The portal does run a Section 138 service, but only for councils that have opted in, and it publishes the list. When we checked that list in September 2026, neither City of Newcastle nor Lake Macquarie City Council was on it. Each takes driveway applications through its own front door, and the two doors are not alike.

City of Newcastle: the Section 138 (Type 1) application

  1. Confirm the application type. Newcastle splits Section 138 in two. Type 1 is a driveway and, where needed, a road opening permit for stormwater or service connections. Type 2 is for new public infrastructure and is not what a homeowner needs.
  2. Design the crossing to drawing A1300. Council’s Driveway Crossing Standard Design Details is the sheet the inspector works from. It sets a single residential crossing at 2.5 to 3.0 metres wide and a double at 2.5 to 4.5 metres, square to the kerb.
  3. Lodge with council. Council’s forms page for the Type 1 application now points to its online services. Council’s post approval guidance tells owners to lodge as soon as practical after development consent so the build is not held up. The Section 138 enquiry line is 02 4974 2000.
  4. Wait for the driveway approval letter. The drawing itself says it is to be read with the approval letter, and that grades follow the letter and AS 2890.1. Where the two differ, the letter wins.
  5. Book the formwork inspection before the pour. Council’s inspection page asks for at least two business days notice, with inspections carried out on weekdays between 7am and 3pm. Nothing is poured on the footway until the formwork has been seen.

Newcastle does not publish an application fee or a processing time on the pages we were able to verify, so this guide does not quote one.

Lake Macquarie City Council: the Minor Public Works application

  1. Register for council’s online services. Registration can take up to one business day to come through, so do it before you need it.
  2. Start a Minor Public Works application and choose “Application for access to property”. If a stormwater pipe or a utility is going through the verge, complete the road opening section as well.
  3. Attach two drawings as flattened PDFs: a site plan with the proposed driveway marked, and a driveway profile showing grades from the road to the house against natural surface levels. Council prefers A3.
  4. Pay the fee in the form. It is calculated inside the application and paid by card at submission. Each driveway is a separate application and a separate fee.
  5. Allow for assessment. Council says straightforward applications are usually processed within 10 to 15 working days, and elsewhere asks for about 21 days.
  6. Read the approval letter for inspections. It states whether a pre-pour or a post-pour inspection applies. That same letter is what a certifier needs to see for the driveway condition on a DA or CDC.

Council’s Asset Technical Officers take questions on 02 4921 0333.

What each council expects in the ground

City of Newcastle (A1300)Lake Macquarie (EGSD 201, 202)
Residential widthSingle 2.5 to 3.0 m, double 2.5 to 4.5 m3.0 m minimum, 4.0 m maximum at the kerb excluding wings, 5.0 m at the boundary
Slab100 mm minimum125 mm minimum
MeshSL72, top, 40 mm coverSL72
Concrete25 MPa at 28 days25 MPa at 28 days, dowelled into the kerb
GradeTo the approval letter and AS 2890.1, with a 1.2 m footway strip at 1 in 4020 percent maximum without further approval, transitions per AS/NZS 2890.1
Power pole750 mm clear750 mm clear
Drainage pit1.0 m from a kerb inlet pit500 mm from a stormwater pit
Street tree3.0 m from the trunkAssessed by trunk size, replanting can be required
CornerSet by approval6.0 m from the tangent point

These are the councils’ published minimums for the crossing, not a description of the driveway inside your boundary, which is covered on our specification page.

Finishes: where decorative concrete stops

Inside the boundary the finish is your choice. On the crossing it is council’s.

Newcastle’s drawing specifies plain concrete with a broom finish and bevelled edges. Coloured or patterned concrete, exposed aggregate and stencilling “may be considered”, and stamped concrete, asphaltic concrete and sealer are not permitted. Lake Macquarie prefers plain concrete with a coved or broom finish, accepts coloured and stencilled concrete if sealed with a non-slip product, and accepts exposed aggregate where at least 75 percent of the stone is rhyolite or basalt. It adds that if the crossing is ever dug up, council restores in plain concrete only.

The common result on a decorative driveway is an exposed or coloured slab to the boundary and a plain broom finished crossing in front of it, with a clean saw cut between the two. It looks deliberate, it passes, and it keeps the dearer finish at $130 to $185 per m² where you see it and the plainer $95 to $130 rate where council insists. The cost guide prices both.

Where the approval sits in the job

The order that avoids delay is: measure and quote, settle the crossing width and finish, lodge the application, receive the approval letter, book the pour, call the formwork inspection, pour. The step people get wrong is lodging late, after the concreter is booked, and then holding a crew for a letter.

Either the owner or the contractor can prepare the application, and both councils hold the owner responsible for the crossing meeting the standard. Lake Macquarie also expects the contractor to be adequately insured and appropriately licensed, and leaves the Before You Dig enquiry with the owner. When you ask for a quote through this site, ask the concreter who will prepare the plan and profile and who will lodge, and have it written into the quote.

Replacing a failed crossing as part of a bigger removal and replacement job? The same approval applies, and the old layback has to come out properly.

Sources, checked September 2026

City of Newcastle: Section 138 (Type 1) application page, Post Approval Information form, standard drawing A1300 Driveway Crossing Standard Design Details (revision 2). Lake Macquarie City Council: Driveways page, Minor Public Works page, engineering standard drawings EGSD 201 and 202. NSW Planning Portal: Section 138 approvals page and its list of participating councils. Councils change fees, forms and drawings without notice, so treat the council’s current page as the authority.

Asked and answered

Section 138, the short answers

Do I need Section 138 approval to replace my existing driveway?

For the part across the footway, yes in both council areas. City of Newcastle lists building, removing and modifying a driveway connected to a public road as works needing approval, and Lake Macquarie City Council states that a replacement driveway needs a new application and fee. Replacing the concrete inside your own boundary is a separate question and usually needs no road approval.

Is Section 138 approval the same thing as a DA or CDC?

No. A DA or a complying development certificate deals with what is built on your land. Section 138 of the Roads Act deals with work on the public road reserve, which includes the verge your driveway crosses. Lake Macquarie City Council says outright that a DA or CDC does not cover the driveway across council's footway, and City of Newcastle lists the Section 138 application as a further approval needed after development consent.

Do I lodge a Section 138 driveway application on the NSW Planning Portal?

Not in these two council areas at the time of writing. The Planning Portal publishes a list of councils that accept Section 138 applications online through it, and when we checked in September 2026 neither City of Newcastle nor Lake Macquarie City Council was on that list. Newcastle takes its Section 138 (Type 1) application directly, and Lake Macquarie uses a Minor Public Works application in its own online services portal.

Can I have exposed aggregate on the council crossing?

Possibly, and the two councils word it differently. Newcastle's standard drawing calls for plain broom finished concrete and says exposed aggregate, coloured or patterned concrete and stencilling may be considered, while stamped concrete and sealer are not permitted. Lake Macquarie accepts exposed aggregate where the stone is at least 75 percent rhyolite or basalt, and warns that it only ever restores a crossing in plain concrete.

How long does driveway approval take?

Lake Macquarie City Council says a straightforward application is usually processed in 10 to 15 working days and asks applicants to allow about 21 days. City of Newcastle does not publish a turnaround on the pages we could verify, so ask when you lodge. Either way the application goes in before the pour is booked, not after.

Next step

Get the driveway and the crossing quoted together

Newcastle Concreters is a referral service. Enquiries are passed to an independent local concreter, who measures the job, quotes it in writing and carries out the work.

Request a measure and quote

Say what you want poured and where. A local concreter rings back to arrange the site measure.

Prefer to talk? (02) 4071 4720

Call (02) 4071 4720 Get a quote